Base on this thread http://scn.sap.com/thread/680120
I assume now that MII 14.0 has the possibility to transport Projects from one system to another system.
I do have the document http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/604eee8c-e551-3010-d6af-b8fb9fe94731?overridelayout=true
which describes how to transport MII configuration from one system to another using CTS.
Can anyone send me a link to document that describe the transport of projects itself?
thanks