Hi Steve
I am working on a project "Plant dash board using MII" and also various other things integrated with SAP MII such as:
1. At the time of good entry vehicle weigh bridge & security cameras integrated with SAP.
2. Biometric attendance system integrated with SAP.
3. Shop floor machine PLC are integrated with SAP though OPC kepware to view real time status of shop floor.
My major concern is SAP PCo agent link goes down automatically down and both OPC and MII stops communicating with each other. I have checked the license it is perfectly fine and both m/c are pinging with each other. Please tell me what could be the possible reason.
Regads
Vivek